Fredonia Mining Files Technical Report for EDM Project

Fredonia Mining Inc. files NI 43-101 technical report supporting preliminary economic assessment for its El Dorado Monserrat gold-silver project in Argentina.

6 cards · 1m 30s · tap to begin

From · · 1m 30s

Fredonia Mining Files Technical Report for EDM Project

Fredonia Mining Inc. files NI 43-101 technical report supporting preliminary economic assessment for its El Dorado Monserrat gold-silver project in Argentina.

In brief

Fredonia Mining Inc. files NI 43-101 technical report supporting preliminary economic assessment for its El Dorado Monserrat gold-silver project in Argentina. Fredonia Mining Inc. filed a technical report in connection with a preliminary economic assessment for its El Dorado Monserrat gold-silver project in Argentina…

Fredonia Mining Files Technical Report

Fredonia Mining Inc. filed a technical report supporting the disclosure of results from a preliminary economic assessment on its El Dorado Monserrat gold-silver project in Santa Cruz province, Argentina.

Technical Report Details

The technical report, titled 'NI 43-101 Technical Report, Preliminary Economic Assessment, El Dorado, Monserrat Gold-Silver Project', has an effective date of August 17, 2026.

Qualified Persons Involved

The report was prepared by Sergio Alvarado Casas, R.M. (Geology) of the Comisión Calificadora de Competencias en Recursos y Reservas Mineras de Chile (CMC) (#004), Ricardo Muñoz González, R.M. (Mining) of the CMC (#005) and MAusIMM (Registration No. 312,131), and Carlos Puga Gómez, R.M. (Mining) of the CMC (#180).

Qualified Person Review

Sergio Alvarado Casas, Geologist, a Qualified Person as defined by NI 43-101, reviewed and approved the technical report for disclosure.

Project Overview

Fredonia holds gold and silver license areas totaling approximately 64,000 ha in Santa Cruz province, Argentina, including its flagship EDM project (approximately 33,500 ha).

Project Context

The EDM project is located close to AngloGold Ashanti’s Cerro Vanguardia gold-silver mine, which produced approximately 180,000 ounces of gold during the twelve months ended June 30, 2026.

What matters most

Fredonia Mining Inc. filed a technical report in connection with a preliminary economic assessment for its El Dorado Monserrat gold-silver project in Argentina.

Read the original on Financialpost

React

Sign in to react and comment.

Comments (0)

Life is short. Keep it sweet. Respect others' opinions and be kind!

    Recommended next

    More decks on fredonia mining and related topics.