Viridian Intersects 15m of 1.1% CuEq in 1.5km Step-Out Drilling

Viridian Metals finds 15.05m at 1.09% CuEq in southern Kraken Main drilling.

7 cards · 1m · tap to begin

From · · 1m

Viridian Intersects 15m of 1.1% CuEq in 1.5km Step-Out Drilling

Viridian Metals finds 15.05m at 1.09% CuEq in southern Kraken Main drilling.

In brief

Viridian Metals finds 15.05m at 1.09% CuEq in southern Kraken Main drilling. Viridian Metals intersected 15.05m at 1.09% CuEq in 1.5km step-out drilling at Kraken Main, supporting thicker mineralized system than initial targets. Originally reported by Financialpost.

New Assays Confirm Higher Grades

Viridian Metals Inc.

Viridian Metals intersected 15.05m at 1.09% CuEq in 1.5km step-out drilling at Kraken Main.

“15.05 metres at 1.09% CuEq”

First Step-Out Results

Results are the first assays from Viridian's southern step-out drilling program.

1.5km Step-Out Hole VKS26-060

Intersected 23.0m at 0.44% CuEq, including 10.85m at 0.72% CuEq.

“23.0 metres at 0.44% CuEq”

1.2km Step-Out Hole VKS26-062

Intersected 40.8m at 0.63% CuEq, including 15.05m at 1.09% CuEq.

“40.8 metres at 0.63% CuEq”

Greater Mineralized Thicknesses

Both holes intersected mineralization from top of bedrock to end of hole, exceeding 30m thickness.

“exceeding 30 metres thickness”

Higher-Grade Zones Emerging

Both holes intersected grades exceeding 1.5% CuEq at bedrock contact.

“exceeding 1.5% CuEq”

Assays Pending from Additional Holes

Results pending from 2.5km of additional southern step-out holes.

“2.5 km of additional southern step-out holes”

The one thing

Viridian Metals intersected 15.05m at 1.09% CuEq in 1.5km step-out drilling at Kraken Main, supporting thicker mineralized system than initial targets.

Read the original on Financialpost

React

Sign in to react and comment.

Comments (0)

Life is short. Keep it sweet. Respect others' opinions and be kind!

    Recommended next

    More decks on viridian metals and related topics.