From Financialpost · · 1m
Viridian Intersects 15m of 1.1% CuEq in 1.5km Step-Out Drilling
Viridian Metals finds 15.05m at 1.09% CuEq in southern Kraken Main drilling.
In brief
Viridian Metals finds 15.05m at 1.09% CuEq in southern Kraken Main drilling. Viridian Metals intersected 15.05m at 1.09% CuEq in 1.5km step-out drilling at Kraken Main, supporting thicker mineralized system than initial targets. Originally reported by Financialpost.
New Assays Confirm Higher Grades

Viridian Metals intersected 15.05m at 1.09% CuEq in 1.5km step-out drilling at Kraken Main.
“15.05 metres at 1.09% CuEq”
First Step-Out Results
Results are the first assays from Viridian's southern step-out drilling program.
1.5km Step-Out Hole VKS26-060
Intersected 23.0m at 0.44% CuEq, including 10.85m at 0.72% CuEq.
“23.0 metres at 0.44% CuEq”
1.2km Step-Out Hole VKS26-062
Intersected 40.8m at 0.63% CuEq, including 15.05m at 1.09% CuEq.
“40.8 metres at 0.63% CuEq”
Greater Mineralized Thicknesses
Both holes intersected mineralization from top of bedrock to end of hole, exceeding 30m thickness.
“exceeding 30 metres thickness”
Higher-Grade Zones Emerging
Both holes intersected grades exceeding 1.5% CuEq at bedrock contact.
“exceeding 1.5% CuEq”
Assays Pending from Additional Holes
Results pending from 2.5km of additional southern step-out holes.
“2.5 km of additional southern step-out holes”
The one thing
Viridian Metals intersected 15.05m at 1.09% CuEq in 1.5km step-out drilling at Kraken Main, supporting thicker mineralized system than initial targets.




