Cover art for Peñoles Signs 20-Year Solar Deal

Peñoles Signs 20-Year Solar Deal

Mexican miner Peñoles locks 20-year solar power contract with Atlas Renewable Energy in Coahuila.

By ·

Nov 18, 2026

11 cards · 1m 50s · tap to begin

From · · · 1m 50s

Peñoles Signs 20-Year Solar Deal

Mexican miner Peñoles locks 20-year solar power contract with Atlas Renewable Energy in Coahuila.

In brief

Mexican miner Peñoles locks 20-year solar power contract with Atlas Renewable Energy in Coahuila. Peñoles signs 20-year solar power deal with Atlas Renewable Energy to cover 550 GWh annually starting 2029. Originally reported by The Rio Times.

Deal Announcement

Aerial view of the Peñasquito open-pit mine in Mazapil, Zacatecas, Mexico

Mexican mining group Peñoles signed a 20-year contract on Wednesday 18 November 2026 to buy power from a new solar plant with batteries in the northern state of Coahuila.

Plant Specifications

The plant, rated at 269 megawatts-peak (MWp), is due to start operating in the first half of 2029, according to Atlas Renewable Energy.

Power Output

The plant will supply about 550 gigawatt-hours (GWh) a year from the first half of 2029.

Silver Price Context

Silver Price Context

Spot silver closed at US$47.47 an ounce on Tuesday 17 November 2026, down about 7.7% in a week.

Atlas Background

Atlas Renewable Energy has developed, financed, built and operated large solar and wind projects in Latin America since 2017.

Peñoles Renewable Usage

Peñoles already gets 49.9% of its electricity from renewables, per its 2025 Sustainability Report.

Carbon Reduction

The plant will avoid about 244,000 tonnes of carbon dioxide equivalent a year using Mexico’s 2024 grid emissions factor.

Household Equivalent

The plant’s output equals about 317,000 Mexican households based on 2017 consumption figures.

Why It Matters

When metal prices fall, a miner’s margin depends more on what it controls, and power is a cost it can lock in for years.

What to Watch

The first checkpoint is the first half of 2029 when the plant should begin operating; the exact month is not confirmed.

What It Means for Investors

Investors can ask any Mexican miner what share of its electricity is under long contracts and at what cost.

The key point

Peñoles signs 20-year solar power deal with Atlas Renewable Energy to cover 550 GWh annually starting 2029.

Read the original on The Rio Times

Read the TL;DR — this story on one card.

How we make summaries

React

Sign in to react and comment.

Comments (0)

Life is short. Keep it sweet. Respect others' opinions and be kind!

    Recommended next

    More decks on peñoles and related topics.