Why Rivian’s Futuristic E-Bike Is Stuck in Gear

Rivian spinoff Also apologized for shipping delays on its software-driven TM-B e-bike, citing supply bottlenecks and complex tech.

By ·

Sep 8, 2026

6 cards · 1 min · tap to begin

From · · · 1 min

Why Rivian’s Futuristic E-Bike Is Stuck in Gear

Rivian spinoff Also apologized for shipping delays on its software-driven TM-B e-bike, citing supply bottlenecks and complex tech.

In brief

Rivian spinoff Also apologized for shipping delays on its software-driven TM-B e-bike, citing supply bottlenecks and complex tech. Cutting-edge hardware features often come with steep manufacturing and regulatory hurdles that push back delivery timelines. Originally reported by The Verge.

Rivian's bold e-bike vision

Rivian Mobility Spinoff Readies $4,500 E-Bike As First Product

Rivian spinoff Also generated massive hype with the TM-B, an ambitious e-bike featuring a software-controlled pedal-by-wire system and removable battery design.

Delivery delays spur backlash

Deliveries were originally promised for spring 2026 and pushed to summer. With fall approaching and zero bikes shipped, frustrated reservation holders took to Reddit.

AI boom squeezes chip supply

Product manager Saul Leiken posted an apology, blaming shortages of circuit boards and integrated circuits driven by demand from the AI boom.

Regulatory battery roadblocks

Regulatory battery roadblocks

The high-capacity battery's 240W power delivery exceeds current safety guidelines, forcing Also to work with standards groups on new safety protocols.

Complex pedal-by-wire system

The DreamRide drivetrain eliminates mechanical connections between pedaling and wheel movement. The high-precision system slowed production ramp-up significantly.

Prioritizing quality over speed

Also admitted it failed to communicate effectively about delays, but stood by its decision to hold back shipments rather than compromise on standards.

As we ramp production we can relax standards against an original timeline or we can hold to a high standard and face potential delays.

The short version

Cutting-edge hardware features often come with steep manufacturing and regulatory hurdles that push back delivery timelines.

Read the original on The Verge

React

Sign in to react and comment.

Comments (0)

Life is short. Keep it sweet. Respect others' opinions and be kind!

    Recommended next

    More decks on rivian and related topics.