# India's Bullet Train Trials Expected by Mid-2027

> India's first indigenous bullet train set for track trials by mid-2027, with service starting late 2027.
- Title: India's Bullet Train Trials Expected by Mid-2027 | Shortify
- Summary: India's first indigenous bullet train set for track trials by mid-2027, with service starting late 2027.
- Keywords: indigenous bullet train, b28 trainset, 280 kmph, surat-vapi section, mumbai-ahmedabad high-speed rail, icf, beml, track trials, passenger capacity, divyangjan, The Economic Times
- URL: https://shortify.news/The_Economic_Times/indias-bullet-train-trials-expected-by-mid-2027
- Source: The Economic Times — https://economictimes.indiatimes.com/industry/transportation/railways/track-trials-of-indias-indigenous-bullet-train-expected-by-mid-2027-first-service-begins-late-2027/articleshow/136029030.cms
- Author: ANI
- Published: 2026-11-20T13:30:00+00:00
- Read time: 1 min
- Topics: indigenous bullet train, b28 trainset, 280 kmph, surat-vapi section, mumbai-ahmedabad high-speed rail, icf, beml, track trials, passenger capacity, divyangjan
## Track trials expected by mid-2027
Track trials of India's indigenous B28 bullet train are expected by mid-2027, with ICF and BEML manufacturing the trainset designed for 280 kmph.
## First service begins late 2027
The first service starts in the last quarter of 2027, beginning with the Surat-Vapi section before expanding to Mumbai.
## Mumbai-Ahmedabad High-Speed Rail
The Mumbai-Ahmedabad High-Speed Rail project covers the route in 1 hour 58 minutes, compared to 8 to 9 hours by road.
## Japan's technology partnership
Japan offered high-speed rail technology that has run for over 60 years without passenger fatalities.
## Construction timeline
Full-scale construction began in 2021 after two and a half years of delays in Maharashtra and a two-year COVID-19 pause.
## Train specifications
The train has a maximum test speed of 280 kmph and an operational speed of 249 kmph, with 557 passenger capacity including Divyangjan spaces.
## Passenger comfort features
The train includes ergonomic seats, LED lighting, power outlets, and bio-digester toilets for passenger comfort.
## Key takeaway

India's indigenous B28 bullet train will begin track trials by mid-2027 and start service in late 2027 on the Surat-Vapi section.

---

Summary: Shortify — https://shortify.news/The_Economic_Times/indias-bullet-train-trials-expected-by-mid-2027
Reporting: The Economic Times — https://economictimes.indiatimes.com/industry/transportation/railways/track-trials-of-indias-indigenous-bullet-train-expected-by-mid-2027-first-service-begins-late-2027/articleshow/136029030.cms

When you use this summary, link the Shortify URL for the summary and credit the reporting to its newsroom.