# Peñoles Signs 20-Year Solar Deal

> Mexican miner Peñoles locks 20-year solar power contract with Atlas Renewable Energy in Coahuila.
- Title: Peñoles Signs 20-Year Solar Deal · The Rio Times | Shortify
- Summary: Mexican miner Peñoles locks 20-year solar power contract with Atlas Renewable Energy in Coahuila.
- Keywords: peñoles, atlas renewable energy, coahuila, solar power, renewable energy, electricity, mining, silver price, power contract, batteries, The Rio Times
- URL: https://shortify.news/The_Rio_Times/penoles-signs-20-year-solar-deal
- Source: The Rio Times — https://riotimesonline.com/penoles-atlas-renewable-energy-solar-ppa-coahuila
- Author: Richard Mann
- Published: 2026-11-18T22:28:31+00:00
- Read time: 1 min
- Topics: peñoles, atlas renewable energy, coahuila, solar power, renewable energy, electricity, mining, silver price, power contract, batteries, news, world
## Deal Announcement
Mexican mining group Peñoles signed a 20-year contract on Wednesday 18 November 2026 to buy power from a new solar plant with batteries in the northern state of Coahuila.
## Plant Specifications
The plant, rated at 269 megawatts-peak (MWp), is due to start operating in the first half of 2029, according to Atlas Renewable Energy.
## Power Output
The plant will supply about 550 gigawatt-hours (GWh) a year from the first half of 2029.
## Silver Price Context
Spot silver closed at US$47.47 an ounce on Tuesday 17 November 2026, down about 7.7% in a week.
## Atlas Background
Atlas Renewable Energy has developed, financed, built and operated large solar and wind projects in Latin America since 2017.
## Peñoles Renewable Usage
Peñoles already gets 49.9% of its electricity from renewables, per its 2025 Sustainability Report.
## Carbon Reduction
The plant will avoid about 244,000 tonnes of carbon dioxide equivalent a year using Mexico’s 2024 grid emissions factor.
## Household Equivalent
The plant’s output equals about 317,000 Mexican households based on 2017 consumption figures.
## Why It Matters
When metal prices fall, a miner’s margin depends more on what it controls, and power is a cost it can lock in for years.
## What to Watch
The first checkpoint is the first half of 2029 when the plant should begin operating; the exact month is not confirmed.
## What It Means for Investors
Investors can ask any Mexican miner what share of its electricity is under long contracts and at what cost.
## Key takeaway

Peñoles signs 20-year solar power deal with Atlas Renewable Energy to cover 550 GWh annually starting 2029.

---

Summary: Shortify — https://shortify.news/The_Rio_Times/penoles-signs-20-year-solar-deal
Reporting: The Rio Times — https://riotimesonline.com/penoles-atlas-renewable-energy-solar-ppa-coahuila

When you use this summary, link the Shortify URL for the summary and credit the reporting to its newsroom.