From mint · Livemint · · 1m 10s
Chennai Metro Phase II: Hitachi Rail's Driverless Train Contract
Hitachi Rail's ₹1,620 crore contract powers Chennai Metro Phase II driverless trains.
In brief
Hitachi Rail's ₹1,620 crore contract powers Chennai Metro Phase II driverless trains. Hitachi Rail's CBTC system enables driverless GoA4 trains on Chennai Metro Phase II's 15km corridor, improving safety and capacity. Originally reported by mint.
Chennai Metro Phase II Opens
The first section of Chennai Metro's Phase II project opened to passengers on October 11, 2026, with 11 elevated stations.
Hitachi Rail Contract Details
Hitachi Rail was awarded a ₹1,620 crore contract in 2023 for signalling systems across Chennai Metro's 119km Phase II network.
GoA4 Driverless Technology
The system supports Grade of Automation 4 (GoA4), enabling driverless trains with real-time speed calculations and 90-second intervals.
CBTC System Benefits
Hitachi Rail's CBTC improves safety, increases passenger capacity, enhances reliability, and reduces maintenance needs for driverless operations.
Poonamallee-Vadapalani Corridor
The 3.7km double-decker corridor connects Chennai's western suburbs to the city centre with 11 elevated stations.
Hitachi Rail Statement
Dr Manoj Krishnappa said the corridor is a vital sustainable transport infrastructure that reduces travel times and supports economic growth.
Driverless Operations Impact
The technology improves operational efficiency as Chennai expands its metro network with driverless trains.
The big picture
Hitachi Rail's CBTC system enables driverless GoA4 trains on Chennai Metro Phase II's 15km corridor, improving safety and capacity.





