From Malay Mail · Ben Tan · · 1m
TL;DR: Johor allocates RM20.73m for 2027 flood risk reduction
Johor sets aside RM20.73m to cut flood risks by 2027.
Johor state government allocates RM20.73m for flood risk reduction initiatives in 2027. Johor sets aside RM20.73m to cut flood risks by 2027. Includes 12 studies at RM1.54m, seven projects at RM1.61m, and three drainage projects at RM1.2m. Four coastal zone projects at RM2.7m, 14 river basin projects at RM5.58m, and 12 agricultural drainage projects at RM3.08m.
- Johor budget allocation
- Flood mitigation projects
- Coastal and river projects
- Additional flood infrastructure
Read the story version — the same reporting as a swipeable deck of 7 cards.






