Cover art for Johor allocates RM20.73m for 2027 flood risk reduction

Johor allocates RM20.73m for 2027 flood risk reduction

Johor sets aside RM20.73m to cut flood risks by 2027.

By ·

Nov 26, 2026

7 cards · 1m · tap to begin

From · · · 1m

Johor allocates RM20.73m for 2027 flood risk reduction

Johor sets aside RM20.73m to cut flood risks by 2027.

In brief

Johor sets aside RM20.73m to cut flood risks by 2027. Johor state government allocates RM20.73m for flood risk reduction initiatives in 2027. Originally reported by Malay Mail.

Johor budget allocation

Johor state government allocates RM20.73m for flood risk reduction initiatives in 2027.

Flood mitigation projects

Includes 12 studies at RM1.54m, seven projects at RM1.61m, and three drainage projects at RM1.2m.

Coastal and river projects

Coastal and river projects

Four coastal zone projects at RM2.7m, 14 river basin projects at RM5.58m, and 12 agricultural drainage projects at RM3.08m.

Additional flood infrastructure

Eight river estuary projects at RM2.52m and minor works at RM2.5m for flood risk reduction.

Water supply infrastructure

RM640,000 allocated for five telemetry stations and water-level gauge upgrades.

Agricultural road projects

RM800,000 for two locations: Lubuk Kepong (RM500,000) and Kampung Melayu Nyior (RM300,000).

Total budget allocation

RM1.19 billion for 33 initiatives under public works portfolio, 38.8% of state expenditure.

The takeaway

Johor state government allocates RM20.73m for flood risk reduction initiatives in 2027.

Read the original on Malay Mail

Read the TL;DR — this story on one card.

More news from Malaysia

How we make summaries

React

Sign in to react and comment.

Comments (0)

Life is short. Keep it sweet. Respect others' opinions and be kind!

    Recommended next

    More decks on johor and related topics.