Railways breaks through 6.59-km tunnel in Himalayan rail project

Cover art for Railways breaks through 6.59-km tunnel in Himalayan rail project

TL;DR: Rail Vikas Nigam Limited achieved breakthrough on Tunnel-14, a six point five nine kilometre tunnel in Uttarakhand's Rishikesh-Karnaprayag rail project, using specialised techniques to excavate through loose soil beneath inhabited areas. Rail Vikas Nigam Limited completes excavation of Tunnel-14 on the Rishikesh-Karnaprayag line, overcoming challenging geology beneath inhabited areas.

Anish MondalNov 27, 2026

From · · · 2m

TL;DR: Railways breaks through 6.59-km tunnel in Himalayan rail project

Rail Vikas Nigam Limited completes excavation of Tunnel-14 on the Rishikesh-Karnaprayag line, overcoming challenging geology beneath inhabited areas.

Rail Vikas Nigam Limited achieved breakthrough on Tunnel-14, a six point five nine kilometre tunnel in Uttarakhand's Rishikesh-Karnaprayag rail project, using specialised techniques to excavate through loose soil beneath inhabited areas. Rail Vikas Nigam Limited completes excavation of Tunnel-14 on the Rishikesh-Karnaprayag line, overcoming challenging geology beneath inhabited areas.

  • Tunnel breakthrough in Uttarakhand
  • The tunnel measures 6.59 kilometres
  • Excavating beneath inhabited areas
  • Specialised techniques used

Read the story version — the same reporting as a swipeable deck of 8 cards.

Read the original on The Indian Express

How we make summaries

React

Sign in to react and comment.

Comments (0)

Life is short. Keep it sweet. Respect others' opinions and be kind!

    Recommended next

    More decks on rail vikas nigam limited and related topics.