This month · the last 30 days
Package 8: the month in review
The 1 biggest story about Package 8 in the last month, each as a one-minute summary with a link to the original reporting.
#1 this monthDelhi-Mumbai Expressway: Gujarat stretch stuck after four bids
NHAI cannot appoint contractor for 35.4-km Gujarat expressway stretch after four failed bidding rounds. NHAI's 35-km Gujarat expressway stretch remains uncontracted after four failed bids.