Today · the last 24 hours
Phase 1b today: the daily rundown
1 story about Phase 1b from the last 24 hours, each as a one-minute summary with a link to the original reporting.
#1 todayBritish Canal Restoration Project
Volunteers are removing an oil pipeline obstructing boat traffic on the Stroudwater Navigation canal as part of a 3.7-mile restoration phase to reconnect it with Britain’s inland canal network.